Bestaro Machinery Co.,Ltd

Bestaro Cranes Serving the development of global industry

Manufacturer from China
Verified Supplier
4 Years
Home / Products / Double Girder Gantry Crane /

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

Contact Now
Bestaro Machinery Co.,Ltd
Visit Website
City:xinxiang
Province/State:henan
Country/Region:china
Contact Person:MrsTina Tan
Contact Now

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

Ask Latest Price
Video Channel
Certification :CE
Place of Origin :Henan,China
MOQ :Negotiation
Price :Negotiation
Payment Terms :L/C, T/T
Supply Ability :500 sets per year
Delivery Time :45 workdays
Packaging Details :Export standard packaging
Keywords :Double Girder Heavy Duty Gantry Crane
Span :5-40m or on request
Max. lifting height :9m,12m,6m
Lifting load :5~20T
Power source :3 phase 380V 50hz or accord your requirements
Crane feature :Easy Operated Girder Bridge Crane
Application :Bridge Construction
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

CE Double Girder Heavy Duty Gantry Crane Bridge Construction

Introduction:

Double girder gantry crane composed of gantry, crane crab, trolley traveling mechanism, cab and electric control system, the gantry is box-shape structure, the track is at the side of each girder and the leg is divided into type A and type U according to user’s requirements. The control method could be ground control, remote control, cabin control or both, in the cab there are adjustable seat, insulating mat on the floor, toughened glass for the window, fire extinguisher, electric fan and auxiliary equipment such as air condition, acoustic alarm and interphone which can be furnished as required by users. This double girder gantry crane is beautiful design and durable and widely used in open-air warehouse, of course, also can be used indoors, but please let us know the condition in your workshop, just tell us your demands, we can design the most suitable crane for you.

Technical Parameter:

Capacity (ton) 5 10 16/3.2 20/5 32/5 50/10
Span (m) 18, 22, 24, 26, 30, 35
Lifting height (m) 10, 11, 12
Working class A5
Control way Cabin control or remote control
Power source 380V 50HZ 3phase (Could supply it as yours)
Trolley lifting mechanism

Lifting speed

(m/min)

Main hook 11.3 8.5 7.9 7.2 7.5 5.9
Auxiliary hook - - 14.6 15.4 15.4 10.4
Trolley traveling mechanism
Traveling speed (m/min) 37.3 35.6 36.6 36.6 37 36
Crane traveling mechanism
Traveling speed (m/min) 37.3 39.7 37.3 39.7 39.4 38.5
Motor power(KW) 40.8-51.8 41.5-52.8 80-77 84-81 99.3-117.3 126.5
Rail track recommended 43kg/m 43kg/m or QU70

Advantages:

1. Module control speed, micro-speed and double speed;

2. Traveling and lifting smoothly;

3. The power for trolley moving adopts flat cable, sliding smoothly;

4. Control box layout is reasonable, easy to repair;

5. Protection class IP55;

6. Optional main power source ;

7. All external cable line number with mark;

8. Safety smooth touch line, high conductivity, small pressure drop;

9. Light weight, installation convenience;

10. Set electric taxi speed is high, ensure continuing power supply;

11. Optional speed control module, and can realize the micro speed and double speed.

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

How to choose:

1. Selection of gantry crane

2. Span and cantilever length

3. The principle of determining the wheelbase

4. The gantry crane spacing size is determined

Photo:

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

Inquiry Cart 0